Issue:
Unit stub outs do not line up for risers to go straight up.
Why It Matters:
Requires extensive onsite correction.
Issue:
Stub outs vary in length across multiple units.
Why It Matters:
Requires on site correction.
Issue:
Stub out dimensions do not match
FBH drawings provided.
Why It Matters:
These can not be addressed until
discovered onsite.
Issue:
Supply stub-outs in conflict with structure.
Why It Matters:
Clashes with studs for Hot Water
Return system.
Issue:
Supply systems are incorrectly labeled, Pipe ID incorrect.
Why It Matters:
Causes challenges onsite to
determine correct stub out purpose.
Issue:
Waste/vent connections in conflict with structure not installed.
Why It Matters:
Threatens to void warranty due to
improper installation.